Whitefish Bay Addition (Underway November, 2007)


                                                                                                                    image property of HB Designs, LLC

A sizeable addition to a home we reroofed with Eco-Shake composite shingles last year.

Technologies to be implemented:

-Biobased 501 insulation
-Fiber-cement siding
-Eco-Shake roofing
-Low-flow fixtures, dual flush toilet
-PEX plumbing
-Non-VOC paints and finishes
-Full jobsite recycling

Photonarrative



Side view of plans


                                                                                                                      image property of HB Designs, LLC

Excavation begins



...and finishes.



We set to building footing forms.



Beep means everything is perfect.



Get rebar into the forms.



No time for pictures while the concrete truck is filling our wheelbarrows.  Here is the finished form with rebar in place.




file:///home/magnus/Desktop/PRAGPROJS/WFB/a_wfb_footingsfinished.JPG

Ready to start framing up walls.



This clothing selection made the morning after the Packers lost to the Cowboys.  Charlie shows a great lack of respect, especially after winning a bet.



Charlie may be replaced.



Checking plans.



The homeowners took a vacation so we took the opportunity to mob the place.  We loaded up to 10 people on the job to demo and reconfigure.  Here are some random shots.



Flooring going in.



Electrical













Meanwhile outside the siding was pulled abd we insulated the walls with cellulose.





One day we came to the site to find a graceful fish leaping over the door.



After investigation we found that Chris and Ed had discovered a way to use rafter cut-offs.  Waste Reduction Strategy- .35 LEED points.



Adam and Charlie put up durable fiber cement siding.







Its a COLD day.  We are going to tip up a wall anyway.  We have the air compresser, nail guns and Passlodes inside by heaters so they don't freeze up on us.





Beardcicles.



Here we go.













Uneventful- just how we like it.



Time lapse... Bonus room over garage insulated with Bio-based 501, vapor barriered (inspector demanded it) and drywall proceeding.





Interior remodel almost complete.



New dining alcove.











Fiber-cement siding complete.



Eco-shake roofing complete.



Bronson and Adam build the deck.  Bronson is less blurry in real life.





Almost there...



More to come...